Kelcroft E&M Limited
unit A10 Kowloon Bay Hong Kong
+852 2335 9830
Kelcroft
Kelcroft EMSD Cooling Tower Audit Kelcroft logo EMSD annual Cooling Tower audit report in accordance with EMSD code of practice part 2 Product #: annual EMSD cooling tower audit
home > services > EMSD cooling tower audit

EMSD Cooling Towers Audit

John Herbert, hong kong energy saving expert, BEAM expert
John Herbert
Director

Annual EMSD Cooling Tower Audit

Since the year 2000 the Electrical and Mechanical Services Department (EMSD) and Water Supplies Dept. (WSD) permitted the use of fresh water cooling towers for comfort cooling Air conditioning systems, the cooling tower being the equipment used to reject heat from the chillers used to cool the building.

cooling tower EMSD audit



Kelcroft has conducted Cooling Tower EMSD annual audits, and prepared the report for EMSD in accordance with the EMSD requirement detailed in the EMSD code of practice.

EMSD cooling tower audit



The EMSD cooling tower audit requires examination of the cooling tower system, and the relevant documention including the drawings, water treatment records, and maintenance records. The report should also idendify any defects discovered.

EMSD cooling tower audit hong kong

Cooling Towers

Learn more about cooling towers in this article by John A. Herbert, published by the BEAM (PDF)

cooling tower

How long does a cooling tower audit report take?

EMSD cooling tower audit requires time to inspect the records, and inpsect the cooling towers. Kelcroft's cooling tower audit report in normally delivered seven days after inspection.

To order EMSD cooling tower report call +(852) 2335 9830, or send us an email message today!


Related Reading




TOP OF PAGE tags: EMSD, cooling, tower, audit, towers, EMSD, code, expert