Cooling Towers Inspection Process Hong Kong

John A. Herbert
John A. Herbert
Director


Cooling Towers in Hong Kong must undergo annual independent audit.

cooling tower EMSD audit process

Cooling Tower Audit Process

The EMSD cooling tower audit requires:

1. An inspection of the cooling tower system;
2. examination of cooling tower records;
3. Provide EMSD with audit report;


The document review shall include examining the relevant documention including the schematic drawing, and the annual record, including

A. water treatment lab results;
B. maintenance records;
C. operating records;


The goal of the audit report is confirmation that the system was operated in accordance with code, and listing any defects discovered.
Kelcroft has conducted Cooling Tower EMSD annual audits, and prepared the report for EMSD in accordance with the EMSD requirement detailed in the EMSD code of practice.

EMSD cooling tower audit process



To order EMSD annual cooling tower inspection report call our Hong Kong office today.