Cooling Towers Mandatory Inspection Process Hong Kong

John Herbert, hong kong energy saving expert, BEAM expert
John Herbert
Director


Cooling Tower Systems in Hong Kong must undergo an independent annual audit in accordance with EMSD code of practice. We have reported on every size of cooling tower from the large to small.

To order your cooling tower audit call +852 2335 9830 today!

cooling tower EMSD audit process



Cooling Tower Audit Process

The EMSD cooling tower audit requires:

1. Examine the cooling tower records;
2. Inspect the cooling tower system;
3. Assess the risk;
4. Issue audit report to EMSD and owner;


The document review shall include examining the relevant documention including the O&M manual, schematic drawing, the plan and annual records, including:

A. water treatment records and lab results;
B. maintenance records;
C. inspection records;
D. cleaning records;
E. prior audit report (if any);


The goal of the audit report is confirmation that the system was operated in accordance with code of practice and list any defects discovered.

Kelcroft has conducted Cooling Tower EMSD annual audits, and prepared reports for EMSD in accordance with the EMSD code of practice.

EMSD cooling tower audit process



Call our Hong Kong office today to order your EMSD cooling tower report.