Cooling Towers Mandatory Inspection Process Hong Kong

John Herbert
Director
Cooling Tower Systems in Hong Kong must undergo an independent annual audit
in accordance with EMSD code of practice. We have reported on every size
of cooling tower from the large to small.
To order your cooling tower audit call +852 2335 9830 today!

Cooling Tower Audit Process
The EMSD cooling tower audit requires:
1. Examine the cooling tower records;
2. Inspect the cooling tower system;
3. Assess the risk;
4. Issue audit report to EMSD and owner;
The document review shall include examining the
relevant documention including the O&M manual,
schematic drawing, the plan and annual records,
including:
A. water treatment records and lab results;
B. maintenance records;
C. inspection records;
D. cleaning records;
E. prior audit report (if any);
The goal of the audit report is confirmation that the system
was operated in accordance with code of practice and list
any defects discovered.
Kelcroft has conducted Cooling Tower EMSD annual audits,
and prepared reports for EMSD in accordance with the EMSD
code of practice.