home > services > cleaner production

Cleaner Production Energy Consultant

John Herbert
John Herbert
REA (Registered Energy Assessor)


Kelcroft's expertise lowers your manufacturing and production operating costs through energy cost savings costs, we identify needless operating and capital expenses resulting from wasted energy consumption and or energy efficiency improvements.

clean production energy consultant



Kelcroft's investigates the energy usage in order to cut energy costs, reducing your energy bills, and also lowering your environmental impact.

Production Space Energy Audit

The production space energy adit differs from typical building energy audit, our energy audit begins with the collection of all information that impacts your energy consumption, the energy performance of your existing systems and installation, existing energy management techniques and utility bills.

We analyse your energy data and compare your facilities energy performance with published standards for your premises and activities of a similar nature and provide proposals.

Environmental Technology Service Provider

Kelcroft is a registered Environmental Technology Service Provider under the Hong Kong Government Cleaner Production Programme also known as CP3.

Energy audit services :: energy engineering solutions for business to reduce operational expenses without jeopardizing customer comfort across Asia. Auditing building energy consumption in Hong Kong and China.

clean production cleaner production


Process Cost Cutting Report

An audit report summarizing our cost cutting findings is provided, sub-divided into three energy management sections, namely:

  • Housekeeping
  • Operation & maintenance measures
  • Capital works

  • Within these three sectors, we explain energy saving options and opportunities for your managers to review and implement.


    clean production


    Housekeeping

    Housekeeping measures are improvements involving virtually no cost, and involve relatively simple steps to start achieving environmental savings. For example training courses to increase energy consumption awareness amongst your staff, as part of a staff induction.


    Operational Measures

    These improvements necessitate some change within your existing regime or maintenance strategy.


    Capital Works

    Capital works would be major improvements to your premises that will require significant expenditure.

    Examining your installation, analyzing your operating and maintenance costs, and evaluating possible options for environmental impacts. Viable proposals that will benefit you financially are offered for appraisal. Our analysis would comprise a practical and economic evaluation of energy saving options. This evaluation would include an investigation of all the various elements that contribute to your owning and operating costs.

    Typically this would include:

  • Initial expenditure - capital required to purchase the plant or equipment
  • Cost in use - the calculated running costs for the installation based on the data retrieved during the survey
  • Investment analysis - payback and net present value calculations, which are tools to establish if a proposal would recoup your investment during a specific period).

  • An economic analysis examines alternatives to identify the overall viability of a particular energy-saving strategy.

    Government Funding

    The Hong Kong government actively encourages businesses in Hong Kong with factories in the PRD to lower pollution and energy consumption. Government funding could be available for your facility.

    Call our Hong Kong office telephone: +(852) 2335 9830 today!