Home > News > Power Crisis II
PRD Power Generation
25 May 2004 | Link | John Herbert

The Pearl River Delta (PRD) power shortage problems has forced many if not all of the factory owners to employ independent diesel fuelled power generators in order to try and maintain factory production during the power outage.
This year (2005) the PRC Government has estimated the peak power shortfall will
be 25,000 kw, unconvinced factory owners employ diesel engines exacerbates the existing
environmental problems.
Energy Conservation
p2ep helps owners reduce their base power load, and therefore lower pollution.
To read more about p2e2 here.
Using diesel engine driven generators for power production alone is not
efficient. To improve efficiencies cogeneration would
improve the overall efficiency from 30% upto 85%.
Optimising loads reduces the need for power, further reducing pollution impacts.
Further Information
If you need further information call Mr John Herbert at our Hong Kong office telephone +(852) 2335 9830 or by fax +(852) 2335 9862.